Metro Syracuse WWTP Secondary Bypass Disinfection Improvements
Onondaga County, Syracuse, NY
Bryant Associates Engineering and Land Surveying, as a subconsultant, is providing resident engineering and construction inspection services for this $16M Wastewater Treatment Plant rehabilitation project which has three (3) separate contracts: General Construction, Electrical and HVAC.
The general construction consists of four new structures―a Chemical Building, Control Building, Disinfection Tanks and Outfall Channel. This project consists of fully automated control systems, flow meters, chemical tank systems, pumps and analyzers, automated dosing systems, Human-Machine Interface (HMI) and incorporation into existing SCADA System. Bryant’s project responsibilities include: developing inspection reports; verifying materials and installation; tracking quantities; creating Change Orders; reviewing/approving payment applications; developing schedules and reviewing testing for concrete and welding inspections.