Construction Management

Three construction workers

Services Rendered

  • Professional Engineering
  • Resident Engineering
  • Construction Inspection
  • Construction Management
  • Program Management
  • Planning and Design
  • Project Controls, Documentation, and Reporting
  • Community Liaison
  • Geotechnical / Material Testing
  • GIS / GPS

Providence Water Supply Board

Water/Wastewater | Construction Management | Survey Services | Site/Civil Engineering | Transportation/Traffic | Structural
/Portals/0/UltraPhotoGallery/685/39/thumbs/3.Water Main (2010)6.jpg
Water Main (2010)6
5/18/2010 11:58:00 AM
Water Main (2010)5
5/18/2010 11:57:00 AM
Water Main (2010)4
5/18/2010 11:40:00 AM
Pits-1
9/12/2007 10:49:00 AM
LSR Trench
6/13/2008 10:44:00 AM
18165-01
8/23/2007 3:29:00 PM

Providence Water Supply Board

Watermain Replacement | Lead Service Replacement

Bryant provided engineering program management, construction management, and construction inspection services to the Providence Water Supply Board Engineering Division in support of its citywide Lead Service Replacement (LSR) Program. The team has been awarded two separate 3-year contracts. The LSR Program requires planning, analysis, study, design, construction management, and post-construction engineering services.

The estimated cost of this 15-year LSR program is estimated at $90 Million. Providence Water estimates spending about $22 million in the first five years of the program and the remaining $68 million over the last 10 years.

© , Bryant Associates Inc, BA Engineers Site Map | Privacy | Contact Us