The New Long Island Bridge, Dorchester Street, that connects Moon Island Road to Long Island, Bridge No. B-16-368 (91M), was structurally deficient and needed to be replaced. This 14 span bridge over the Boston Harbor connects to the Island which is the home of the Menino Summer Camp.
Bryant performed bathymetric surveys of the harbor and performed surveying of the piers in order for the design to be completed. Bryant also performed utility coordination on this project.