Bryant performed resident engineering services for the removal and replacement of this sewer pumping station as the existing station capacity of 500gpm was being exceeded during storm events. The new precast pump station work has the capacity of 950gpm.
Site work included the construction of a stormceptor and stormwater infiltration basins and transformers, all within a small-size footprint within a 100’ buffer of a pond.